
BACK TO ALL
12nd June 2026
Kirribilli Harbour - Tower Crane Installation
Following a significant period of excavation, Kirribilli Harbour has reached an important construction milestone with the installation of the tower crane on site.
Marking the transition from excavation into the structural phase, the tower crane will play an integral role in the next stage of construction, enabling the efficient movement of materials across the site as the building begins to take shape.
For Made Property, it represents another important step in bringing the vision for Kirribilli Harbour to life — a collection of considered residences shaped by craftsmanship, enduring design and an extraordinary sense of place.
Nestled on the edge of Sydney Harbour, with views across the water to the city and beyond, Kirribilli Harbour has been designed in response to its remarkable setting. As construction progresses above ground, we look forward to seeing the architecture and detail of this unique harbourside development emerge.
Made for Life.
